Skip to main content

LHS netters sweep Pipestone

The Luverne Cardinals nailed down their third Southwest Conference tennis win of the season when they blanked the Pipestone Arrows 7-0 Thursday in Pipestone.
Luverne won all seven matches in straight sets against a young Pipestone team.
“Our experience really showed in all of our matches. We have a deep lineup to pick from this year, which is a luxury for a coach,” said LHS mentor Greg Antoine.
Joey Vajgrt (6-0, 6-1 over Spencer Kruse at No. 1), Dustin Deutsch (6-2, 6-0 over Hans Elders at No. 2), Joel Wohnoutka (6-0, 6-2 over Alex Bauer at No. 3) and Jonny Vajgrt (6-0, 6-0 over Ethan Conrad at No. 4) secured singles wins for the Cards.
Scott Nelson and Blake Ziegler topped Nathan Baatz and Jared Scheibout by 6-0 and 6-3 scores at first doubles, Brandon Bosch and Trevor Johnson handed Trace Lueck and Levi Carstensen a pair of 6-1 setbacks in the second slot, and Matt Arends and Zack Gillette bested Jared Carlson and Bill Smith by 6-0 and 6-1 scores at No. 3.

Patriots record first golf win

The Hills-Beaver Creek boys secured their first golf victory of the 2011 season at the Westbrook-Walnut Grove Invitational staged Thursday in Westbrook.
The Patriots shot a 199 to finish behind W-WG (171) and Fulda (184) in the team standings, but H-BC proved to be six-strokes better than Mountain Lake Christian (205) at event’s end.
Austin Rauk and Caleb Schroer led Patriots with 47- and 48-stroke tallies, while Wyatt Ellefson and Stuart Plimpton added 51- and 53-stroke rounds to the team score.
Cody Ellefson and Jacob Osborn shot 55- and 61-stroke scores without impacting the team effort.
MLC’s Aaron Walzak earned medalist honors with a 40.
Aaron Theisen led W-WG with a 41, while Tony Holinka shot a team-low 42 for Fulda.

AHS teams golf in Worthington Thursday

The Adrian Dragon golf squads participated in competitions hosted by Southwest United at Prairie View Golf Links in Worthington Thursday.
The Adrian girls dropped a 216-200 decision to Southwest Christian in a head-to-head match.
The AHS boys shot a 180 as a team to place second in a three-team field consisting of SWC (174) and SWU (197).
Justin Elias and Zach Berreau shot 44s to led the AHS boys to their second-place finish, while Ryan Elias shot a 45 and Collin Kemper and Ben Henning turned in 47s for the Dragons.
Jaydan Bullerman carded a 56 without impacting the scoring.
SWC’s Monte DeKam secured medalist honors with a 41. Clay Salzwedel led SWU with a 45.
Emaleigh Vreeman fired a 40 to lead the SWC girls to a four-shot win over AHS.
Laura Lorand paced the Dragons with a 50, while Marissa Veld, Katie Wieneke and Mackenzie Wagner contributed 53-, 55- and 62-stroke rounds to the team tally.
Jada Elias and Samantha Boyle carded 65- and 71-stroke rounds without impacting the scoring.

Cardinal girls take SWC golf match

The Luverne girls' golf team notched its second Southwest Conference win of the season when they topped the Pipestone Arrows 203-226 Thursday in Pipestone.
Junior Emily Spreiter secured medalist honors for the Cards by shooting an 11-over-par 47.
Emilee Johnson recorded a 48 to challenge Spreiter as the medalist, while Kirsten Olson and Erin Doherty added 53- and 55-stroke rounds to the winning team tally.
Tressa Ykema and Makayla Sterrett carded 57s without padding the team scoring.
Megan Sommer led the Arrows with a 53.

Golf boys upend Arrows

The Luverne boys' golf team picked up their third Southwest Conference win of the season when they traveled to Pipestone Thursday.
With four Cardinals shooting identical scores to share medalist honors, Luverne strolled to a 160-177 win over the Arrows.
Ben Nath, Brandon Klein, Cody Hemme and Austin Eeten all shot 40s for the winners, while Dylan Skattum and Matthew Sterrett carded 44s without impacting the scoring.
Conner Wacker led the Arrows with a 53.

Cards split set with JCC

The Luverne Cardinals fell from baseball’s unbeaten ranks Thursday at Redbird Field.
After pulling out a 6-5 win in the bottom half of the eighth inning in Game 1 against Jackson County Central, the Huskies snapped Luverne’s seven-game winning streak by nipping the
Cards 4-2 in the finale.
Luverne hosts Fairmont Monday.
Luverne 6, JCC 5
The Cardinals rallied late in Game 1 to win their seventh game of the season.
JCC led 4-1 after scoring a pair of runs in the top half of the sixth inning, but the Cards scored once in the bottom of the sixth and twice in the seventh to knot the score at four.
Brady Dinger was hit by a pitch and scored Luverne’s sixth-inning run when Adam Gruis singled.
Cody Christensen singled and Dinger and Andrew Kannas were hit by pitches to load the sacks in the seventh.
Nick Rittenhouse plated Christensen with a sacrifice fly to center field before courtesy runner Richard Gonzalez scored the tying run on a wild pitch.
JCC scored once in the top of the eighth to move in front 5-4, but the Cards settled the issue with a two-run rally in the bottom half of the frame.
Connor Fitzer walked and Christensen singled before Joey Slieter tied the game with an RBI double. Following an intentional walk to Gonzalez to load the bases, Dinger was hit by a pitch to send Christensen home with the game-winning run.
JCC scored the game’s first two runs in the second inning before Luverne made it a 2-1 game with an RBI single from Gruis in the fourth.
Christensen picked up the pitching winning after tossing one inning of one-run, two-hit relief.
Gonzalez pitched the first five innings, surrendering three runs, five hits and recording six strikeouts. Kannas tossed two innings of one-run, two-hit ball.
Box score AB R H BI
Fitzer 4 1 1 0
Christensen 5 2 3 0
Slieter 5 0 2 1
Kannas 3 1 1 0
Gonzalez 0 1 0 0
Dinger 2 1 0 1
Rittenhouse 3 0 1 1
Gruis 3 0 3 2
Wenninger 0 0 0 0
Reisdorfer 0 0 0 0
Verhey 0 0 0 0
Swier 4 0 0 0
Rofshus 3 0 1 0
JCC 4, Luverne 2
The Huskies scored three runs in the first three innings and never lost the lead in Game 2.
The Cards did trim the difference to one run (3-2) with a two-run rally in the top of the fifth inning, but JCC plated the final run of the game in the bottom of the fifth.
Gruis and Schuyler Swier drew walks to start Luverne’s fifth-inning rally.
Fitzer singled home one run and Christensen registered the second RBI of the frame after bouncing into a fielder’s choice.
Kannas was charted with the loss after yielding three runs and four hits in the game’s first two and two-thirds innings.
Slieter surrendered one run and five hits in the next inning and two-thirds, while Skyler Wenninger twirled two innings of scoreless, one-hit ball.
Box score AB R H BI
Fitzer 3 0 3 1
Christensen 4 0 0 1
Slieter 4 0 1 0
Kannas 2 0 1 0
Rofshus 2 0 0 0
Reisdorfer 2 0 0 0
Dinger 1 0 0 0
Wenninger 0 0 0 0
Gonzalez 2 0 0 0
Rittenhouse 2 0 0 0
Verhey 1 0 0 0
Gruis 2 1 0 0
Swier 2 0 0 0
Solma 0 1 0 0

Prairie Rose Wind meeting set for April 8

Prairie Rose Wind meeting set for April 8
State of Minnesota
Public Utilities Commission & Department of Commerce
Notice of Public Meeting and Revised Draft Site Permit
Issued: April 18, 2011
PLEASE TAKE NOTICE that the Minnesota Public Utilities Commission accepted a change in size (from 101 MW to 200 MW) for the proposed Prairie Rose Wind project on April 8, 2011. In accepting the change in size, the Commission required an additional comment period to be established and an additional public meeting to be held in the vicinity of the project. The Commission also accepted and issued a revised draft site permit for the project which now includes additional turbines inside the same proposed site boundaries. The comment period and the public comment meeting are intended to allow members of the public to express their concerns and opinions on the need for and the siting of the proposed Prairie Rose project and its increase in size. The revised draft site permit is intended to establish the conditions necessary to mitigate the environmental and human impacts resulting from the construction and operation of the project.
The Public Comment Meeting will attempt to address the following: (1) whether the proposed Project is needed and in the public interest, and (2) issues related to the proposed siting of the Project. The meeting will be held at the time and location listed below. The ending time reflects the latest the public comment meeting will run. The meeting may conclude earlier if all attendees have had the opportunity to comment and all other business has been concluded.
MEETING AND DATE LOCATION
Memorial Hall
May 19, 2011 101 East Wall Street
7:00 PM – 10:00 PM Jasper, MN 56144
Facilities Planner Bret Eknes from the Minnesota Public Utilities Commission will preside at the hearing. Any person who would like to comment on the need for the Project or the proposed siting can do so at the hearing or in writing to Bret Eknes, Minnesota Public Utilities Commission, 121 7th Place East, Suite 3:50, St. Paul, MN 55101-2147; (fax) 651-297-7073; email: bret.eknes@state.mn.us.
Written Comments. Written comments on the merits of the Certificate of Need or on the contents of the Draft Site Permit should be submitted to Mr. Eknes at the address listed above. Comments will be accepted through Friday, May 27, 2011. Mailed comments must be postmarked by this date. Faxed and delivered comments must be received by 4:30 p.m. on this date.
Purpose and Conduct of the Meeting. The purpose of the public comment meeting is to receive input about the Project. During the meeting, members of the public may offer either oral or written testimony, offer exhibits for inclusion in the public record and ask questions of the applicant and agency representatives. Any person who wishes to ask questions, but does not want to ask the questions personally, may submit them in writing to Mr. Eknes who will then ask the question during the meeting.
Interested persons may comment on the Certificate of Need and Site Permit Applications, Environmental Report, Draft Site Permit or on the Project generally. The meeting will continue until all persons have had the opportunity to offer testimony and ask questions.  If needed, the meeting may be recessed and continued by Mr. Eknes. The comments received at the meeting or filed within the comment period will be considered by the Commission in its final deliberations of the certificate of need and site permit applications.
Request for Accommodation. Any person who needs an accommodation for a disability in order to participate in the hearing, and any person who requires an interpreter, including a foreign language interpreter, should promptly notify the Minnesota Public Utilities Commission using the Contact Information for Mr. Eknes below. 
Environmental Report. The Department of Commerce Energy Facility Permitting has completed and issued an environmental report for the proposed Prairie Rose Wind Farm. The environmental report addresses potential human and environmental impacts of the proposed project and alternatives. For a copy of the environmental report, please see project contacts and information below.
Draft Site Permit. On March 28, 2011, the Commission issued an order approving a revised draft site permit for distribution and public comment. For a copy of the draft site permit, please see project contacts and information below.
Project Description. The project for which the certificate of need and site permit is being requested includes the following:
1.  A wind turbine layout consisting of up to 124 (updated from 67) turbines, depending on turbine specifications; the size change application describes the possible use of General Electric 1.6 MW or Vestas 1.8 MW (updated from General Electric 1.5 MW, Vestas 1.8 MW or Siemens 2.3 MW) wind turbines;
2.  Associated facilities, including gravel access roads, an electrical collection system, permanent meteorological towers, one step-up substation, a Sonic (SODAR) or Light (LIDAR) Detection and Ranging unit and an O&M building.
The Project area consists of approximately 35,335 acres located in Denver, Rose Dell and Springwater Townships in Rock County and Elmer and Eden Townships in Pipestone County. The Applicant has acquired easements, or made lease agreements, for the Project on approximately 23,145 acres in the townships.
The project has an associated 24-mile 115 kV transmission system, with up to 7 miles in Minnesota, which would connect to the Split Rock Substation near Brandon, South Dakota (see IP-6838/TL-10-134). An application for an HVTL route permit was filed on March 10, 2011.
Eminent Domain. The Applicant does not have the power of eminent domain to acquire the land or wind rights for the project. Wind and land rights necessary to build the facility must be in the form of voluntary easements or lease agreements between individual landowners and the applicant.
Authority and Statement of Issues to be Decided. In order to proceed with this Project, the Applicant must obtain a certificate of need and a site permit from the Commission. The Commission is authorized by Minnesota Statutes section 216B.243, to issue a certificate of need for a large wind energy facility if the applicant can demonstrate that there is a need for the Project. A certificate of need is a state permit that is issued upon a determination that construction of an energy facility is in the public interest. The Commission is required by Minnesota Statutes section 216B.243, subdivision 4, to hold a hearing on the application for a certificate of need.
The Commission is authorized by Minnesota Statutes section 216F.04 to issue large energy conversion system (LWECS) site permits for certain wind energy facilities. When the Commission designates a site, it issues a site permit for the construction of a facility specifying the design, location, preparation, and operation of the facility, along with any other appropriate conditions it deems necessary. The Commission is required by Minnesota Statutes section 216F.05 and Minnesota Rule 7854.0900 to hold a public meeting on an application for a site permit for an LWECS.
Contested Case Hearing Request. Any person may request a contested case hearing on the certificate of need or the site permit applications. All requests must be filed by Friday, May 27, 2011. The person requesting the contested case hearing must list the issues sought to be addressed in the hearing and the reason that a contested case hearing is required to resolve those issues. The Commission shall order a contested case hearing if it finds that a material issue of fact has been raised and that the holding of the contested case hearing will aid it in making a final decision on whether or not to authorize construction of the Project.
Project Contacts and Information. For more information on the Certificate of Need, please contact:
Bret Eknes, Facilities Planner
Minnesota Public Utilities Commission
121 7th Place E., Suite 350
St. Paul, MN 55101-2147
Phone: (651) 201-2236
bret.eknes@state.mn.us
For additional information regarding the Site Permit application, or to place your name on the project mailing list maintained for this project, please contact:
David Birkholz, State Permit Manager Jamie MacAlister, Public Advisor
Minnesota Department of Commerce MN Department of Commerce
85 7th Place East, Suite 500 85 7th Place East, Suite 500
St. Paul, MN 55101 St. Paul, MN 55101
Phone: (651) 296-2878 Phone: (651) 296-1335
Fax: (651) 297-7891 Fax: (651) 297-7891
david.birkholz@state.mn.us jamie.macalister@state.mn.us
The certificate of need application and environmental report can be found on the eDockets website: https://www.edockets.state.mn.us/EFiling/ search.jsp (enter the year “10” and the number “80”). The LWECS site permit application and draft site permit can also be found on the eDockets website (enter the year “10” and the number “425”).
The site permit application, draft site permit, environmental report, and other relevant documents, including Minnesota’s statutes and rules governing the site permitting process, are also available on the Commission’s energy facility permitting website at: 
http://www.energyfacilities.puc.state.mn.us/Docket.html?Id=28286
Copies of the applications are also available for review at the county courthouses of Pipestone and Rock counties; city offices in Luverne and Pipestone; and with the township clerks of Denver, Eden, Elmer, Rose Dell and Springwater.
Questions regarding the Prairie Rose Wind farm and its permit application can also be directed to the applicant by contacting:
Patrick Smith Scott Briffett
Geronimo Wind Energy Geronimo Wind Energy
7650 Edinborough Way, Suite 725 7650 Edinborough Way, Suite 725
Edina, MN 55435 Edina, MN 55435
Phone: (952) 988-9000 Phone: (507) 337-1959
patrick@geronimowind.com scott@geronimowind.com
This document can be made available in alternative formats (i.e., large print or audio) by calling 651.296.0406 (voice).  Persons with hearing or speech disabilities may call us through Minnesota Relay at 1.800.627.3529 or by dialing 711.
(5-5)
 

Good Samaritan bond hearing set for May 24

Good Samaritan bond hearing set for May 24
Notice of Public Hearing
NOTICE OF PUBLIC HEARING ON THE PROPOSED ISSUANCE OF BONDS BY THE COLORADO HEALTH FACILITIES AUTHORITY TO FINANCE AND REFINANCE PROJECTS OF THE EVANGELICAL LUTHERAN GOOD SAMARITAN SOCIETY, A NORTH DAKOTA NONPROFIT CORPORATION, LOCATED IN
THE STATE OF MINNESOTA
MINNESOTA AGRICULTURAL AND ECONOMIC
DEVELOPMENT BOARD
NOTICE IS HEREBY GIVEN that the Minnesota Agricultural and Economic Development Board (the “Ag Board”) or its designee representative, shall meet on May 24, 2011, at 9:00 a.m., at 1st National Bank Building, 332 Minnesota Street, Saint Paul, Minnesota, for the purpose of conducting a public hearing on a proposed issue of one or more series of bonds by the Colorado Health Facilities Authority (the “CoHFA Bonds”) to finance or refinance projects on behalf of The Evangelical Lutheran Good Samaritan Society, a North Dakota nonprofit corporation (the “Applicant”). Such persons as desire to be heard with reference to said issue of bonds will be heard at this public hearing.
The projects located in Minnesota (the “Mn Projects”) whose debt is to be financed or refinanced and the estimated principal amounts of the financing attributable to each project, are:
(i)     from approximately $800,000 to $1,700,000 for remodeling of the skilled nursing facility located at 75507 240th Street in Albert Lea, Minnesota;
(ii)     $8,310,000, for construction of a skilled nursing facility addition and remodel at the Ambassador Good Samaritan Center – New Hope facility located at 8100 Medicine Lake, New Hope, Minnesota;
(iii)   $5,640,000 for the construction of an addition and remodeling to the Good Samaritan Center - Battle Lake facility located at 105 Glenhaven Drive, Battle Lake, Minnesota;
(iv)   $595,000 for rehabilitation of resident rooms and conversion at Good Samaritan Society - Maplewood located at 550 Roselawn Avenue, St. Paul, Minnesota; and
(v)    $1,510,000 for the construction of a skilled nursing facility addition and remodel at the Good Samaritan Society - Mary Jane Brown located at 110 S. Walnut Avenue, Luverne, Minnesota.
The Applicant is the initial owner of the Mn Projects, and the Mn Projects will be owned, operated and managed by the Applicant. It is contemplated that the Mn Projects will be used, or will continue to be used, as nursing homes, senior housing, assisted living or related facilities. The total estimated amount of the CoHFA Bonds attributable to the Mn Projects is an amount not to exceed $16,870,000. The CoHFA Bonds and the interest thereon shall be payable solely from the revenue pledged to the payment thereof, and no holders of any such bonds shall ever have the right to compel any exercise of the taxing powers of the State of Minnesota or any political subdivision thereof to pay the CoHFA Bonds or the interest thereon nor to enforce payment against any property of said State or said political subdivision.
This Notice of Public Hearing is being given pursuant to Section 147(f) of the Internal Revenue Code of 1986, as amended.
A copy of the Ag Board’s proposed resolution regarding the Ag Board’s “approval”, as such term is used in IRC §147(f) and for the sole purpose of complying with the requirements therein, of the CoHFA Bonds is available for public inspection at the offices of the Ag Board at 500 Metro Square, 121 7th Place East, Saint Paul, Minnesota from the date of this notice to the date of the public hearing hereinabove identified, during normal business hours.
All persons interested may appear and be heard at the time and place set forth above, or may file written comments with the Executive Director prior to the date of the hearing set forth above.
Dated: 5-5-11
BY ORDER OF THE MEMBERS OF THE MINNESOTA AGRICULTURAL AND ECONOMIC DEVELOPMENT BOARD
 
Paul Moe
/s/ Paul Moe                 
Executive Director
(5-5)
 
 

City of Luverne seeks seal coat bids by May 17

 City of Luverne seeks seal coat bids by May 17
ADVERTISEMENT FOR BIDS
Sealed proposals will be received by the City Council of Luverne, Rock County, Minnesota, at the Luverne City Offices, 305 E. Luverne St., P.O. Box 659, Luverne, Minnesota, 56156-0659 on Tuesday, the 17th of May, 2011, at 10:00 o’clock A.M. for the 2011 Seal Coat Improvements, Luverne, Minnesota, at which time the proposals shall be publicly opened and read aloud.
The approximate quantities of work on which proposals will be received are as follows:
15,582 Gal. Bituminous material for seal coat
780 Tons Seal coat aggregate
and other related items of construction.
All bids shall be made on proposal forms furnished by the Engineer and shall be accompanied by bid security in the form of a certified check or bid bond, made payable to the City of Luverne, Minnesota, in the amount of ten percent (10%) of the bid, which security becomes the property of the City in the event the successful bidder fails to enter into contract and post satisfactory bond. Work shall commence on or after July 18, 2011, and completed on or before September 9, 2011.
The City reserves the right to reject any or all proposals and to waive technicalities and irregularities. The City also reserves the right to increase, decrease or delete items of work to comply with budget limitations.
The City is an Equal Opportunity Employer.
Project manual and drawings may be examined at the office of the Engineer or at the Luverne City Offices. Copies of said project manual and drawings may be secured from DeWild Grant Reckert and Associates Company, 1302 South Union Street, Rock Rapids, Iowa, 51246, telephone (712) 472-2531, FAX (712) 472 2710, upon payment of ten dollars ($10.00), none of which is refundable.
Published upon order of the City Council of Luverne, Minnesota.
CITY OF LUVERNE, MINNESOTA
By /s/ Pat Baustian
Pat Baustian
Mayor
(5-5)
 

City of Luverne amends Ordinance No. 317

City of Luverne amends Ordinance No. 317
ORDINANCE NO. 317, THIRD SERIES
AN ORDINANCE RELATING TO TIMES OF OPERATIONS FOR FOUR-WHEEL ALL-TERRAIN VEHICLES AND GOLF CARTS, AMENDING ORDINANCE NO. 292, THIRD SERIES, SEC. 8.62, SUBD. 3. A & 5. B AND ADOPTING BY REFERENCE CITY CODE CHAPTER 8 AND SECTION 8.99, WHICH AMONG OTHER THINGS, CONTAIN
PENALTY PROVISIONS
THE CITY OF LUVERNE DOES HEREBY ORDAIN:
SECTION 1. City Code, Sec. 8.62, Subd. 3. A, is hereby amended in its entirety as follows:
Subd. 3 Permits.
A. Permits Required. No person shall operate a motorized golf cart or four-wheel all-terrain vehicle on streets and alleys within the city limits or under the jurisdiction of the City without first obtaining a written permit from the City, except no permits will be required for parades. Said permits shall prohibit operation of a motorized golf cart or Class 1 four-wheel all-terrain vehicles on county, state and federal highways and roads within the city limits; and also shall prohibit operation on school property and City park property. Said permits shall prohibit operation of a motorized golf cart or Class 1 four-wheel all-terrain vehicle between the hours of one-half hour after sunset to one-half hour before sunrise.
SECTION 2. City Code, Sec. 8.62, Subd. 5. B, is hereby amended in its entirety as follows:
Subd. 5 Operation of Vehicles.
B.  Times of Operation. Motorized golf carts and Class 1 four-wheel all-terrain vehicles may not be operated on designated roadways between the hours of one-half hour after sunset to one-half hour before sunrise. They shall not be operated in inclement weather or when visibility is impaired by weather, smoke, fog, or other conditions, or at any time when there is insufficient light to clearly see persons and vehicles on the roadway at a distance of 500 feet.
SECTION 3. This ordinance takes full force and effect seven (7) days after its publication.