Work crews from Dunnick Brothers Inc. continue making progress on the Warren Street project in Luverne.
With underground water and sewer infrastructure in place, the street bed is being graded and packed.
Workers said it won’t be long until curb and gutter are in place and the street reopens.
The street officially closed to traffic on July 6, and contractors have spent much of the past month replacing underground infrastructure along that road.
The street will be widened to allow parking on both sides. There will be sidewalks on both sides (with no assessments to residents).
Rock County Highway Engineer Mark Sehr is heading up the project on Warren Street, which is a county-state aid roadway.
It affects Warren Street between Highway 75 (near Smooky’s Pizza) and County Road 4 (Main Street, near Luverne Flowers), in addition to one block west of County Road 4.
The $1.4 million project includes the removal of the pavement, curb and gutter and some sidewalk.
Sanitary sewer, water basins, storm sewer, sidewalks, curb and gutter and bituminous pavement will be installed.
The $873,000 county portion of the project includes the street reconstruction and storm sewer.
You must log in to continue reading. Log in or subscribe today.


