A crane hoists the 86,000-pound boiler to its new location at Luverne's Agri-Energy plant. The boiler and thermal oxidizer are the plant's $1.5 million solution to the odor problem that has plagued the area since the plant began operating in 1998. Story inside.
Photo by Lori Ehde