Skip to main content

Linemen 'resag' sagging power lines

Subhead
Repair work prompted by damage in April 2013 ice storm
By
Lori Ehde, Editor

A small army of Sioux Valley Energy linemen assembled north of Luverne Wednesday morning to repair damage incurred in the April 2013 ice storms.
“The line went down after the storm, and since then it’s been out of sag,” said Tim Fey, Sioux Valley operations manager.
“These guys are ‘retensioning’ the lines, pulling them from one pole to the next.”
Fey said the work affected 16 to 18 poles — about a mile’s worth of power line, and six or eight customers were without power for a couple hours.
He said the work will prevent the loose lines from “galloping” in future wind events, which will ultimately prevent future outages.

You must log in to continue reading. Log in or subscribe today.