Skip to main content

Hoogland: Work was intended to repair altered waterway, prevent erosion

To the Editor:
After going to court with a violation for not following a restoration order, which I did not agree with, I was denied even discussing the order, whether it was right or wrong. Or if it even made any common sense, or if part of it was right or part of it was wrong. It was all put together.
The restoration order was served on a construction project that was about half done. After, I was served a cease and desist order, which prevented me from doing any more work on the project. Then later on I was served a restoration order, which I appealed two or three times and finally wanted to wait till the court trial. Through the trial, I wanted to verify its authenticity, whether it was right or wrong, but was denied from entering any evidence pertaining to the order according to the National Farm Security Act law.
The land in question has enough slope, according  to the National Security Act, that it shouldn’t be called wetlands. Wetlands is an area that is flat with water ponding in it (according to the description from the National Food Security Act in the wetland portion) and drains very slowly.
The land in question has quite a bit of fall because if it were flat, a tile would not work. The reason in the restoration order that they gave me showed that there was too much fall. They want me to put in four rock dams in the waterway, which would create ponding of water and thus make their wetlands. They also manipulated this area of the ground years ago when they dammed up the waterway to make a stock pond for pasture. At that time they also altered the waterway, which I found when I was cleaning it out. I found an old culvert between the pond and the property line. This was on the west side.
Now on the east side, according to their map, showed only three tenths of an acre of wetland, which is way up on the north corner against the property line. According to the map, everything else was not wetlands. Now the restoration order wants me to build four rock spill-way dams because of the fall (which they say the water will run too fast) which also proves that it cannot be a wetland. They want me to remove the tile, which was put around a hundred feet away from the ditch, which also would not work because of the fall (if it truly were wetlands).
Due to the extensive tiling in land above, the water keeps running throughout the year, thus creating and expanding wet conditions on my ground due to the plugged ditch and manipulated waterways. This is why I was in the process of cleaning out the waterway (which they did not let me finish). I wanted to sift out the rocks to put them back in the bottom of the waterway to prevent further erosion, and get the sides of the ditch and waterway back in grass to prevent erosion.
Albert Hoogland
Rural Garretson
 
 
 

You must log in to continue reading. Log in or subscribe today.