At their regular meeting on Tuesday, Aug. 9, the Hills City Council accepted a bid from Leuthold Plumbing, Heating and Electric for the Hills football field bypass sewer project.
The project calls for capping an existing 8-inch sewer line that runs east and west across the football field. This line is sagging in several areas.
To increase flows the plan calls for a new 10-inch line that bypasses the football field to the south.
The city submitted plans for the project to MPCA and it was approved last spring.
The accepted bid was for $24,900.
A representative from DeWild, Grant, Reckert and Associates, the firm who drew up the plans, staked off the area earlier this week.
Leuthold Plumbing, Heating and Electric plans to start as soon as the area is staked and should have the project completed well before the Hills-Beaver Creek football season begins.
Rainwater inresidents’ yard
Darrell and Marie Brown appeared before the council to request help with routing rainwater through their property.
The couple reported that during heavy rainfalls the runoff water does not move along their property the way it is intended.
It should move from the northeast corner to the southeast corner before turning to the west and moving under the alley.
Instead it collects across the southeastern corner of the yard and builds up into what they described as a pond.
The Browns reported that water often bypasses the north-south culvert that runs along Water Avenue and instead runs across the road.
They also have issues with gravel collecting along the southern edge of the property. The gravel collects from runoff rainwater in the Hills Storage Center parking area.
Councilman Keith Elbers and Public Works Officer Eric Harnack visited the property after a rain shower and agreed there were issues that needed to be addressed.
The first solution is to place larger rocks along the edge of the city’s property between the Hills Storage Center and the southern edge of the Brown property with the intention of catching the debris before it gets to the Browns’ yard.
The city will also make sure the culvert running north and south along Water Avenue and Second Street is clean and clear of debris.
Additionally, they plan to cut into the edge of the property located across the street, creating a larger slope to force water into the culvert instead of running over the street.
The council asked the Browns to keep them informed if these solutions make any difference in the amount of water that accumulates and how water moves through their property.
In other city business:
•Building permits were approved for the following projects: to Louis and Joni Deelstra for windows and a home addition at 212 S. Central Ave.; to Jim and Marilyn Jellema to shingle their house and garage; to the Hills United Reformed Church to shingle the parsonage; to Dean Luethje to install a new sidewalk at his daughter’s house; and to Dan Fick to construct a yard shed.


