The Hills City Council set the 2011 preliminary levy at 10.1 percent more than last year’s amount.
The increase largely covers a $22,900 increase in the fire protection budget.
The projected general fund revenues are $311,175, generated from local government aid from the state, property taxes, investments and fees collected. LGA is not projected to change in the upcoming year.
The total amount levied to the taxpayers will be $117,406, which is approximately a 10.1 percent increase over last year’s $106,641.
The levy will be certified on Dec. 13, following a truth-in-taxation meeting. Setting the preliminary levy in September gives property owners a chance to voice their concerns over budget items.
Council members made decisions on a variety of issues involving emergency communications, replacing equipment, seal coating and capital improvements.
Fire protection increase
A federal mandate changing radio frequencies needs to be implemented in Rock County during the upcoming year.
The mandate requires the city of Hills and Martin Township to replace the majority of their fire department’s handheld radios, mobile radios (installed in the trucks) and pagers.
The city has been working with Rock County on possible funding options via grants, which has helped to purchase three new ARMOR system radios.
Last spring the council met with representatives from the township and everyone agreed to go with the ARMOR system at an estimated price of $32,000. The city’s portion of those purchases is $16,000.
The department also needs new pagers, because the old pagers will not work once the new system is launched. The department needs to purchase 16 pagers next year at $380 a piece. The council budgeted $3,200 to purchase pagers.
Another one-time fire protection expense in the budget is $2,800 to replace the fill pipe at the water tower. A solution to problems with the current fill pipe has yet to be reached, but the council hopes to make the improvements needed in the upcoming year. The city plans to split this cost with the township.
A final $900 was added to the fire protection budget to cover the cost of servicing the department’s air tank fill station and their air packs.
Unlike the one-time communication costs that will be removed from the budget next year, the maintenance fees on the fill tank and air packs will need to become part of the annual fire budget.
Other increases
The Hills street department accounts for additional city spending.
The proposed budget includes funds for street patching, de-icing sand, repairing the street sweeper and various culvert repairs. It also calls for funds for seal coating and notes $5,000 toward replacing the city pickup. The council acknowledged that the pickup would probably not be purchased next year, but it is good to start budgeting for a new one in the future.
The council took a similar approach in the park fund, budgeting $5,000 for a mower replacement.
Fee increases
Council members made changes to the sewer and water fees paid by residents.
The Sewer Improvement Fee increased from $5 to $10 per customer. The assessment is to help cover costs of major sewer repairs and improvements the city is making to its system.
This includes covering a loan the council will take out this fall for sewer lining on the west side of town and installing a new sewer line south of the football field.
The loan payment is estimated at $32,000.
The residential sewer rate will remain the same.
The water rate was increased by $1 per increment. Expenses in this fund increased slightly to cover the costs of having the city water utilities updated on an official map.
A portion of this cost was also added into the sewer fund. The new maps will reflect all work being done to improve the water and sewer infrastructure as well as new pipes installed at the high school building site and along North Summit Avenue.
Recycling and garbage fees were not increased.
In other city business:
•The council acted on liquor licenses for the Hidden Hills Café and Last Stop Bar.
Approval was given to the Hidden Hills Café to renew its on-sale license and off-sale license.
The Last Stop Bar’s licenses for on- and off-sale liquor were renewed.
•Former public works officer Stacen Burgers attended the meeting to discuss maintenance issues that have yet to be resolved from his time working with the city.
He agreed to train his replacement, Eric Harnack (who took over the position in June), on snow removal and maintenance.
He also urged the city to continue to make improvements to the sewer infrastructure, especially the line running along the alley between Second and Third Streets and Central and Anna Avenue.
•Building permits were granted to the following residents: to Renae Knobloch for a cement deck, to Catherine Fikse to reshingle her home, to Stacen Burgers for a cement pad, to Jim Steinberg to replace roof and add a porch addition, to Larry Knobloch to install a garden shed, to Mark Sater to shingle and Jim Metzger to replace two driveways, a patio and build a yard shed.
You must log in to continue reading. Log in or subscribe today.


